# Mull Drilling Company
> **Administrative - Formal** · FY2002 · — · Final Order With Penalty
## Case
- **Activity ID:** `86721`
- **Case Number:** 08-2002-0140
- **Type:** Administrative - Formal
- **Lead:** EPA
- **Outcome:** Final Order With Penalty
- **Penalty assessed:** —
- **Cost recovery:** —
- **Compliance action $:** —
- **Multimedia (multi-env):** —
## Defendants
- Mull Drilling Company (complaint) (settlement)
## Summary

'This administrative penalty order is issued to Mull Drilling Company for failure to prepare and implement a Spill Prevention, Control and Countermeasures (SPCC) Plan for its Kern A facility. Also, on 8/3/2002, Mull Drilling reported that a blocked water disposal system line caused approximately 250 barrels of crude oil and 100 barrels of produced water to overflow from an oil field tank battery at the Kern A facility. The overflow resulted in the discharge of crude oil and produced water into a tributary to the Smoky Hill River.'

---
*Source: [EPA ECHO](https://echo.epa.gov/) · AI Analytics · CC0 1.0*