R & J CLEANERS FAILED TO KEEP A LOG AND RECEIPT OF PERC THAT IT PURCHASED EACH MONTH AND OF THE YEARLY CON- SUMPTION OF PERC BY THE FACILITY, DATES WHEN DRY CLEANING SYSTEM COMPONENTS ARE INSPECTED FOR PERCEPTIBLE LEAKS AND THE NAME AND LOCATION OF DRY CLEANING SYSTEM COMPONENTS WHERE PERCEPTIBLE LEAKS ARE DETECTED, AS REQUIRED BY 40 CFR SECTION 63.324(D)(3). R&J CLEANERS FAILED TO INSPECT THE COMPONENTS OF THE DRY CLEANIN GSYSTEM ON AT LEAST A BI- WEEKLY BASIS FOR PERCEPTIBLE LEAKS WHILE THE DRY CLEANING SYSTEM IS OPERATING, AS RQUIRED BY 40 CFR SECTION 63.322(1). *