# PRASA CAMUY - HATILLO WWTP
> **Administrative - Formal** · FY2002 · — · Final Order No Penalty
## Case
- **Activity ID:** `8795`
- **Case Number:** 02-2002-3031
- **Type:** Administrative - Formal
- **Lead:** EPA
- **Outcome:** Final Order No Penalty
- **Penalty assessed:** —
- **Cost recovery:** —
- **Compliance action $:** $312K
- **Multimedia (multi-env):** N
## Defendants
- PRASA CAMUY-HATILLO WWTP (complaint) (settlement)
## Summary

NPDES PERMIT EFFLUENT VIOLATIONS AND NON-PROPER         OPERATION AND MAINTENANCE (GENRAL CONDITION C.5) OF THE      CAMUY-HATILLO WWTP.  PRASA HAS VIOLATED GENERAL CONDITION    C.2 OF THE PERMIT WHICH REQUIRES THE PERMITEE TO COMPLY      WITH ALL CONDITIONS OF ITS NPDES PERMIT.  BY THIS CONSENT    ORDER, PRASA HAS AGREED TO IMPLEMENT A PMP; REPAIR AND       REPLACE THE INFLUENT PUMPS, REFURBISH THE APU; REPAIR THE    ROTARY ARM OF THE BIOFILTER; REPAIR AND REFURBISH THE GRIT   CHAMBER MECHANISM; REPAIR AND REFURBISH THE SCUM COLLECTOR   MECHANISUM; PROVIDE ENGINEERING ANALYSIS TO EVALUATE         CURRENT SLUDGE WASTING PRACTICES AGAINST THE INSTALLATION    OF A BELT FILTER PRESS FOR THE CAMUY-HATILLO WWTP; AND       SUBMIT TO EPA A QUARTERLY REPORT DETAILING THE STATUS AND    PROGRESS OF THEIR EFFORTS TO COMPLY WITH THIS ORDER.

---
*Source: [EPA ECHO](https://echo.epa.gov/) · AI Analytics · CC0 1.0*