THE FACILITY WAS INSPECTED ON SEPT. 13, 2001. THE FACILITY DIE NOT HAVE LINE LEAK DETECTOR ON ONE OF IT PRESSURIZED PIPING AND IMPROPER MAINTENANCE AND OPERATION OF ITS CATHODIC PROTECTION SYSTEM AS REQUIRED BY THE COMMONWEALTH OF PR ENVIRONMENTAL QUALITY BOARD (PREQB). THE LLD WAS IN- STALLED AND THE SYSTEM TESTED AND PASSED THE CATHODIC PRO- TECTION TEST IN ADDITION TO A TTT TESTS PERFORMED ON ITS SYSTEM. TESTS RESULTS AND CERTIFICATION PROVIDED TO PEA. *