FACILITY WAS ISSUED A UST FIELD CITATION FOR THE FOLLOWING VIOLATIONS: 40 CFR 41(A): FAILURE TO MONITOR USTS AT LEAST EVERY 30 DAYS; 40 CFR 280.41(B)(1)(II): FAILURE TO HAVE ANNYAL LINE TIGHTNESS TEST OR PERFORM MONTHLY MONITORING OF PRESSURIZED PIPING; 40 CFR 280.44(A); AND FAILURE TO CONDUCT ANNUAL TEST OF LINE LEAK DETECTOR SYSTEM FOR UNDERGROUND PIPING. THE FACILITY HAS SUBMITTED DOCUMENTATION DEMONSTRATING THAT THE USTS ARE BEING MONITORED EVERY 30 DAYS, THE PRESSU- RIZED LINES HAVE BEEN TIGHNESS TESTED, AND THE LINE LEAK DETECTORS HAVE BEEN TESTED. *