IN JUNE 1997, EPA CONDUCTED A MULTI-MEDIA INSPECTION OF THE CAMPUS OF UNIVERSITY OF RHODE ISLAND AND DISCOVERED A GASOLINE DISPENSING FACILITY ON SITE. THE FACILITY LACKED STAGE II VAPOR COLLECTION AND CONTROL SYSTEMS. RI'S SIP REQUIRES THAT A GASOLINE DISPENSING FACILITY, WHICH FIRST DISPENSES 10,000 GALLONS OF FUEL OR MORE IN A MONTH AFTER 11/15/92, INSTALL STAGE II WITHIN SIX MONTHS OF EXCEEDING THE 10,000 GALLON THRESHOLD OR BY 11/15/94, WHICHEVER IS LATER. EPA SUBSEQUENTLY DISCOVERED THAT RI DOA OPERATED THE FACILITY, AND THAT THE FACILITY FIRST EXCEEDED THE 10,000 SOMETIME IN 1994, AND BY 12/94 AT THE LATEST. THUS, THE FACILITY WAS REQUIRED TO INSTALL STAGE II BY 7/1/95. RI DOA DID NOT INSTALL STAGGE II UNTIL 3/98.