# The McAlpine Company (Oak Hill Subdivision)
> **Administrative - Formal** · FY2003 · — · Final Order No Penalty
## Case
- **Activity ID:** `89458`
- **Case Number:** 04-2003-4752
- **Type:** Administrative - Formal
- **Lead:** EPA
- **Outcome:** Final Order No Penalty
- **Penalty assessed:** —
- **Cost recovery:** —
- **Compliance action $:** —
- **Multimedia (multi-env):** —
## Defendants
- The McAlpine Company (complaint) (settlement)
## Summary

AO issued 11/20/2002.  Respondent failed to take corrective action to control the discharge of sediments outside the disturbed limits; in violation of Part I.B.2 of the Permit.  Respondent failed to comply with final limitations and controls as evidenced by the loss of sediments from the site; in violation of Part I.C.1 of the Permit.  Respondent failed to provide the operation and maintenance necessary to operate the storm water controls efficiently as evidenced by the lack of maintenance of the silt fencing, sediment basin #1, and the lack of storm drain inlet protection; in violation of Part I.C.2 of the Permi

---
*Source: [EPA ECHO](https://echo.epa.gov/) · AI Analytics · CC0 1.0*