# Mulvaney Properties
> **Administrative - Formal** · FY2003 · — · Final Order No Penalty
## Case
- **Activity ID:** `89811`
- **Case Number:** 04-2003-4751
- **Type:** Administrative - Formal
- **Lead:** EPA
- **Outcome:** Final Order No Penalty
- **Penalty assessed:** —
- **Cost recovery:** —
- **Compliance action $:** —
- **Multimedia (multi-env):** —
## Defendants
- Mulvaney Properties (settlement)
## Summary

AO issued 11/20/2002.  Respondent failed to implement the approved Plan; deviation from the Plan is a violation of Part I, A.2, of the Permit.  Respondent failed to inspect facilities as required by Part I.B.1 of the Permit.  Respondent failed to take corrective action to control discharge of sediments, in violation of Part I.B.2 of the Permit.  Respondent failed to keep records of inspections as required by Part I.B.3 of the Permit.  Respondent failed to provide the operation and maintenance necessary to operate the storm water controls at optimum efficiency, as evidenced by the discharge of sediments from the site and the lack of maintenance of silt fencing and at the sedimentation basins, in violation of Part I.C.2 of the Permit.  Respondent failed to properly operate and maintain all facilities and systems of treatment and control to achieve compliance with the conditions of the Permit, as evidenced by the discharge of sedimetns from the site and the lack of maintenance around the site, in violation of Part II.C.1 of the Permit.  Respondent failed to allow access to and copy, at reasonable times, records of inspection, in violation of Part II.D.5.b of the Perm

---
*Source: [EPA ECHO](https://echo.epa.gov/) · AI Analytics · CC0 1.0*