# Cadence McShane Corporation
> **Administrative - Formal** · FY2003 · — · Final Order With Penalty
## Case
- **Activity ID:** `89957`
- **Case Number:** 06-2003-1773
- **Type:** Administrative - Formal
- **Lead:** EPA
- **Outcome:** Final Order With Penalty
- **Penalty assessed:** —
- **Cost recovery:** —
- **Compliance action $:** —
- **Multimedia (multi-env):** —
## Defendants
- Cadence McShane Corporation (complaint) (settlement)
## Summary

APO issued 12/12/02. There were no records of inspections being done from March 27, 2002 through April 15, 2002, entrance to the facility was not properly stabilized to prevent off site tracking of sediment, control measures were not properly installed or maintained, and litter, construction debris, and construction chemicals were noted on the construction site. (Cadence McShane Corp. was the developer for the facility described here, the Ford Motor Co. Industrial Plant, located in Fort Worth, Texas, Per Pat Willis Inspector - 02/21/08 RSG)

---
*Source: [EPA ECHO](https://echo.epa.gov/) · AI Analytics · CC0 1.0*