# High Energy Access Tools  (HEAT) Corporation  (NMU000621)
> **Administrative - Formal** · FY2003 · — · Unilateral Administrative Order Without Adjudication
## Case
- **Activity ID:** `90021`
- **Case Number:** 06-2003-1793
- **Type:** Administrative - Formal
- **Lead:** EPA
- **Outcome:** Unilateral Administrative Order Without Adjudication
- **Penalty assessed:** —
- **Cost recovery:** —
- **Compliance action $:** —
- **Multimedia (multi-env):** —
## Defendants
- High Energy Access Tools (HEAT) Corporation (complaint) (settlement)
## Summary

A compliance evaluation inspection was conducted 6/5/02 and the facility was found to be in non-compliance with the requirements of the General Permit for Storm Water Discharges from Construction Activities.  Administrative Order CWA-06-2003-1793 was drafted and routed 1/7/03.

**RELIEF SOUGHT:  1) Within 30 days, Respondent shall make a complete and correct application for permit coverage, and shall submit to EPA, a copy of the application and a copy of the confirmation of coverage; 2) Within 30 days, Respondent shall take whatever corrective action is necessary to correct the deficiencies and eliminate and prevent recurrence of the violations, and shall submit a written report detailing the specific activities taken; 3) If complete correction of the violations is not possible within 30 days, submit a comprehensive plan to do so; and 4) Within 45 days, arrange a Show Cause meeting with EPA

---
*Source: [EPA ECHO](https://echo.epa.gov/) · AI Analytics · CC0 1.0*