Violations code:
Inspections required by 40 CFR Part 112 are not in accordance iwth written procedures developed for the facility.
Written procedures and a record of inspections are not maintained for three years.
No training on the operation and maintenance of equipment to prevent discharges.
No training on the applicable laws, rules, and regulations.
Spill prevention briefings are not scheduled and conducted preiodically.
Secondary containment appears to be grossly inadequate.
Inadequate secondary containment, and/or rack drainage does not flow to catchment basin, treatment system, or quick drainage system.
Access penalty code: $1250.00