# Grand Resources, Inc.
> **Administrative - Formal** · FY2003 · — · Final Order With Penalty
## Case
- **Activity ID:** `90908`
- **Case Number:** 06-2003-4301
- **Type:** Administrative - Formal
- **Lead:** EPA
- **Outcome:** Final Order With Penalty
- **Penalty assessed:** —
- **Cost recovery:** —
- **Compliance action $:** —
- **Multimedia (multi-env):** —
## Defendants
- Grand Resources, Inc. (complaint) (settlement)
## Summary

*Plan not certified by a professional engineer
*Written procedures and a record of inspections are not made part of the plan.
*Visual tank inspections are not conducted periodically by appropriate personnel and/or inspections do not include tank foundation and supports.
*Above ground valves and pipelines are not examined periodically on a scheduled basis for general condition (includes items, such as: flange joints, valve glands 2nd bodies, drip pans, pipeline supports, bleeder and guage valves, polish rods/stuffing box.

---
*Source: [EPA ECHO](https://echo.epa.gov/) · AI Analytics · CC0 1.0*