1. No evidence of three-year review of plan by owner/operator.
2. Records of inspections of aboveground tanks are not maintained.
3. No high-level pump cutoff devices set to stop flow at a predetermined tank content level.
4. Plan has inadequatae or no discussion of bulk storage tanks.
5. Plan has inadequate or no disucssion of facility tank car and tank truck loading/
unloading rack.