1. Plan not certified by a professional engineer
2. Written procedures and a record of inspections are not made part of the plan.
3. No designated person responsible for spill prevention.
4. Drainage from undikee areas not into ponds, lagoons, or catchment basins, or no diversion systems to return spills to the facility.
5. Records of inspections of aboveground tanks are not maintained.