# Horizon Natural Resources (Interim Compliance Order)
> **Administrative - Formal** · FY2003 · — · Unilateral Administrative Order Without Adjudication
## Case
- **Activity ID:** `95080`
- **Case Number:** 04-2003-5758
- **Type:** Administrative - Formal
- **Lead:** EPA
- **Outcome:** Unilateral Administrative Order Without Adjudication
- **Penalty assessed:** —
- **Cost recovery:** —
- **Compliance action $:** —
- **Multimedia (multi-env):** —
## Defendants
- HORIZON NATURAL RESOURCES (settlement)
## Summary

1/13/03 -- FINDINGS OF VIOLATION AND INTERIM ORDER FOR COMPLIANCE ISSUED.  ORDER REQUIRES RESPONDENT TO:  (1) CEASE AND DESIST ACTIVITIES EXCEPT FOR STABILITIZATION; (2) SEEK AUTHORIZATION FROM THE HUNTINGTON DISTRICT ARMY CORPS OF ENGINEERS TO PERFORM INTERIM CORRECTIVE MEASURES AT THE SUNNY RIDGE MINE TRACT TO PREVENT A POTENTIAL FLOOD EVENT THAT WOULD IMPACT DOWNSTREAM RESIDENCES; (3) COORDINATE ALL EMERGENCY STABILIZATION AND PROTECTION MEASURES WITH EPA AND DSMRE BEFORE INITIATING WORK.

---