# Dallas Area Rapid Transit and AUI Contractors, L.P. (TXR10QN46, TXR10QH29)
> **Administrative - Formal** · FY2003 · — · Final Order With Penalty
## Case
- **Activity ID:** `95091`
- **Case Number:** 06-2003-1937
- **Type:** Administrative - Formal
- **Lead:** EPA
- **Outcome:** Final Order With Penalty
- **Penalty assessed:** —
- **Cost recovery:** —
- **Compliance action $:** —
- **Multimedia (multi-env):** —
## Defendants
- Dallas Area Rapid Transit & AUI Contractors, L.P. (complaint) (settlement)
## Summary

Violations: 1. SWPPP has not been properly updated to reflect actual Best Management Practices (BMPs) and site conditions.  2. There was off-site sediment tracking onto roadways at the unstabilized construction entrances and problems with siltation of storm sewer inlets.  3. The inspection reports were not signed and certified, and inspector qualifications were not in the plan.  4. There was no documentation about compliance with the Endangered Species Act and the Historic Preservation Act.

---
*Source: [EPA ECHO](https://echo.epa.gov/) · AI Analytics · CC0 1.0*