# INDUSTRIAL PARK DEVELOPMENT CORP.
> **Judicial** · FY1985 · — · Final Order With Specified Cost Recovery
## Case
- **Activity ID:** `9820`
- **Case Number:** 03-1985-0019
- **Type:** Judicial
- **Lead:** EPA
- **Outcome:** Final Order With Specified Cost Recovery
- **Penalty assessed:** —
- **Cost recovery:** $250K
- **Compliance action $:** —
- **Multimedia (multi-env):** N
## Defendants
- INDUSTRIAL PARK DEVELOPMENT CORP. (complaint) (settlement)
## Summary

THE ABM-EDDYSTONE SITE IS LOCATED IN A MIXED INDUSTRIAL/  RESIDENTIAL AREA BETWEEN RT 291 & THE DELAWARE RIVER IN THE  BORO OF EDDYSTONE, DELAWARE COUNTY, PA.                         THE SITE IS AN ABANDONED DUMPSITE APPROXIMATELY 5.5 AC IN AREA.  AT THE TIME THAT EPA DECIDED TO TAKE ITS REMOVAL RE-  SPONSE THE SITE CONTAINED MORE THAN 200 DRUMS, A PARTIALLY   FULL TANKER TRUCK OF APPROXIMATELY 2000 GAL CAPACITY, SLUDGE IMPREGNATED & STAINED SOILS AROUND LEAKING & DETORIATING 55  GAL DRUMS, & AN ASSORTMENT OF SMALLER CONTAINERS.               DAVID DOLGENOS, RONALD ALTMAN & NORMAN M. FEINBERG TRAD-  ING AS IPDC ARE THE CURRENT OWNERS OF THE SITE & HAVE BEEN   OWNERS SINCE 1971.                                              IN 6/77, IPDC ENTERED INTO A LEASE W/ABM DISPOSAL SERVICE CO., INC., WHEREUNDER ABM WAS PERMITTED TO STORE TANK TRUCKS & TRAILERS AT THE SITE.  ABM STORED THE WASTES ON THE SITE & SUBSEQUENTLY ABANDONED THOSE WASTES.  ABM THEN FILED FOR     BANKRUPTCY & ITS ASSETS WHERE PLACED INTO RECEIVERSHIP.         A SITE INVESTIGATION BY THE EPA REG III FIELD INVESTIGA-  TION TEAM IN 8/83 & SUBSEQUENT ANALYSES OF SITE INVESTIGA-   TION SAMPLES SHOWED THE PRESENCE OF CARCINOGENIC & EXTREMELY TOXIC MATERIALS IN THE DRUM & THE SOIL.  A FIELD INVESTIGA-  TION BY EPA & NOAA ON 10/30/84 CONFIRMED THE PRESENCE OF     TOXIC SUBSTANCES & IDENTIFIED EXTREMELY CORROSIVE WASTES ON  THE SITE.  HAZARDOUS SUBSTANCES FOUND IN THE CONTAINERS AND/ OR THE SOIL AT THE SITE INCLUDED TRICHL

---
*Source: [EPA ECHO](https://echo.epa.gov/) · AI Analytics · CC0 1.0*