# Approval and Promulgation of Implementation Plans; Wisconsin
> **Rule** · Direct final rule. · Published 2001-11-08 · Effective 2002-01-07 · 66 FR 56447
## Document
- **Document number:** 01-27829
- **Category:** other
- **Federal Register citation:** 66 FR 56447
- **CFR reference:** 40 CFR 52
- **Publication date:** 2001-11-08
- **Effective date:** 2002-01-07
- **State:** WI
- **EPA docket:** WI107-01-7337a
## Abstract

EPA is approving revisions to the minor source/minor modification pre-construction permitting requirements for Wisconsin Electric Power Company's (WE's) Pleasant Prairie Power Plant. The Pleasant Prairie Power Plant is located in Kenosha County at 8000 95th Street, Pleasant Prairie, Wisconsin. The Wisconsin Department of Natural Resources (WDNR) submitted the revised requirements on February 9, 2001, as amendments to its State Implementation Plan (SIP). The revisions include the expansion of the State's general construction permit exemption to include certain activities at the Pleasant Prairie facility.

## Source
- [Federal Register document](https://www.federalregister.gov/documents/2001/11/08/01-27829/approval-and-promulgation-of-implementation-plans-wisconsin)
---
*AI Analytics · CC0 1.0*