# Approval and Promulgation of Implementation Plans; Texas; Revisions to Regulations for Control of Air Pollution by Permits for New Construction or Modification
> **Rule** · Direct final rule. · Published 2003-09-30 · Effective 2003-12-01 · 68 FR 56176
## Document
- **Document number:** 03-24553
- **Category:** air-emissions
- **Federal Register citation:** 68 FR 56176
- **CFR reference:** 40 CFR 52
- **Publication date:** 2003-09-30
- **Effective date:** 2003-12-01
- **State:** TX
- **EPA docket:** TX-155-1-7591a
## Abstract

The EPA is taking direct final action to approve revisions to the Texas State Implementation Plan (SIP). This includes revisions that the Texas Commission on Environmental Quality (TCEQ) submitted to EPA on January 3, 2003, to require that equipment associated with a new or relocated concrete crushing facility be located or operated at least 440 yards from any building used as a single or multi-family residence, school, or place of worship. This action is being taken under section 110 of the Federal Clean Air Act (the Act, or CAA).

## Source
- [Federal Register document](https://www.federalregister.gov/documents/2003/09/30/03-24553/approval-and-promulgation-of-implementation-plans-texas-revisions-to-regulations-for-control-of-air)
---
*AI Analytics · CC0 1.0*