# Approval and Promulgation of Air Quality Implementation Plans; Pennsylvania; Sulfur Dioxide Attainment Demonstration for the Warren County Nonattainment Area and Permit Emission Limitations for Two Individual Sources in Warren County
> **Rule** · Direct final rule. · Published 2003-01-17 · Effective 2003-03-18 · 68 FR 2454
## Document
- **Document number:** 03-731
- **Category:** air-emissions
- **Federal Register citation:** 68 FR 2454
- **CFR reference:** 40 CFR 52
- **Publication date:** 2003-01-17
- **Effective date:** 2003-03-18
- **State:** PA
- **EPA docket:** PA037/072/184-4190a
## Abstract

EPA is approving a State Implementation Plan (SIP) revision submitted by the Pennsylvania Department of Environmental Protection (PADEP). This revision contains enforceable operating permit emission limitations for the Reliant Warren Generating Station and the United Refining Company, and an air quality modeling demonstration that indicates that the allowable emission limits will provide for the attainment of the National Ambient Air Quality Standards (NAAQS) for sulfur dioxide (SO<INF>2</INF>) in the Conewango Township, Pleasant Township, Glade Township, and the City of Warren nonattainment area. The modeling demonstration assumes new SO<INF>2</INF> limits for the Reliant Warren Generating Station and the United Refining Company. This SIP revision replaces all previously submitted SIP revisions for the SO<INF>2</INF> nonattainment areas in Warren County, Pennsylvania. The implementation plan was submitted by Pennsylvania to satisfy the requirements of the Clean Air Act (CAA) pertaining to nonattainment areas.

## Source
- [Federal Register document](https://www.federalregister.gov/documents/2003/01/17/03-731/approval-and-promulgation-of-air-quality-implementation-plans-pennsylvania-sulfur-dioxide-attainment)
---
*AI Analytics · CC0 1.0*