# Direct Final Rule Staying Numeric Limitation for the Construction and Development Point Source Category
> **Rule** · Direct final rule. · Published 2010-11-05 · Effective 2011-01-04 · 75 FR 68215
## Document
- **Document number:** 2010-28033
- **Category:** water-quality
- **Federal Register citation:** 75 FR 68215
- **CFR reference:** 40 CFR 450
- **Publication date:** 2010-11-05
- **Effective date:** 2011-01-04
- **EPA docket:** EPA-HQ-OW-2010-0884
## Abstract

EPA is taking direct final action to stay the numeric effluent limitation of 280 NTU and associated monitoring requirements for the Construction and Development Point Source Category. This action is necessary so that EPA can reconsider the record basis for calculating the numeric effluent limitation. EPA expects to move expeditiously with its reconsideration, and will remove the stay when such reconsideration is completed.

## Source
- [Federal Register document](https://www.federalregister.gov/documents/2010/11/05/2010-28033/direct-final-rule-staying-numeric-limitation-for-the-construction-and-development-point-source)
---
*AI Analytics · CC0 1.0*