# Approval and Promulgation of Implementation Plans; Alabama; 110(a)(1) and (2) Infrastructure Requirements for the 1997 8-Hour Ozone National Ambient Air Quality Standards
> **Rule** · Final rule. · Published 2011-07-13 · Effective 2011-08-12 · 76 FR 41100
## Document
- **Document number:** 2011-17470
- **Category:** air-emissions
- **Federal Register citation:** 76 FR 41100
- **CFR reference:** 40 CFR 52
- **Publication date:** 2011-07-13
- **Effective date:** 2011-08-12
- **State:** AL
- **EPA docket:** EPA-R04-OAR-2010-0720-201123 FRL-9436-3
## Abstract

EPA is taking final action to approve the December 10, 2007, submission by the State of Alabama, through the Alabama Department of Environmental Management (ADEM) as demonstrating that the State meets the state implementation plan (SIP) requirements of sections 110(a)(1) and (2) of the Clean Air Act (CAA or the Act) for the 1997 8-hour ozone national ambient air quality standards (NAAQS). Section 110(a) of the CAA requires that each state adopt and submit a SIP for the implementation, maintenance, and enforcement of each NAAQS promulgated by the EPA, which is commonly referred to as an "infrastructure" SIP. Alabama certified that the Alabama SIP contains provisions that ensure the 1997 8-hour ozone NAAQS is implemented, enforced, and maintained in Alabama (hereafter referred to as "infrastructure submission"). Alabama's infrastructure submission, provided to EPA on December 10, 2007, addressed all the required infrastructure elements for the 1997 8-hour ozone NAAQS. Additionally, EPA is responding to adverse comments received on EPA's March 17, 2011, proposed approval of Alabama's December 10, 2007, infrastructure submission.

## Source
- [Federal Register document](https://www.federalregister.gov/documents/2011/07/13/2011-17470/approval-and-promulgation-of-implementation-plans-alabama-110a1-and-2-infrastructure-requirements)
---
*AI Analytics · CC0 1.0*