# Approval and Promulgation of Implementation Plans; Tennessee; 110(a)(1) and (2) Infrastructure Requirements for the 1997 8-Hour Ozone National Ambient Air Quality Standards
> **Rule** · Final rule. · Published 2012-07-23 · Effective 2012-08-22 · 77 FR 42997
## Document
- **Document number:** 2012-17644
- **Category:** air-emissions
- **Federal Register citation:** 77 FR 42997
- **CFR reference:** 40 CFR 52
- **Publication date:** 2012-07-23
- **Effective date:** 2012-08-22
- **State:** TN
- **EPA docket:** EPA-R04-OAR-2011-0353
## Abstract

EPA is taking final action to approve in part, and conditionally approve in part, the State Implementation Plan (SIP) submission, submitted by the State of Tennessee, through the Tennessee Department of Environment and Conservation (TDEC), to demonstrate that the State meets the requirements of sections 110(a)(1) and (2) of the Clean Air Act (CAA or Act) for the 1997 8-hour ozone national ambient air quality standards (NAAQS). Section 110(a) of the CAA requires that each state adopt and submit a SIP for the implementation, maintenance, and enforcement of each NAAQS promulgated by EPA, which is commonly referred to as an "infrastructure" SIP. TDEC certified that the Tennessee SIP contains provisions that ensure the 1997 8-hour ozone NAAQS are implemented, enforced, and maintained in Tennessee (hereafter referred to as "infrastructure submission"). With the exception of sub-element 110(a)(2)(E)(ii), which pertains to the requirements of section 128(a)(1) of the CAA, Tennessee's infrastructure submission, provided to EPA on December 14, 2007, addresses all the required infrastructure elements for the 1997 8-hour ozone NAAQS.

## Source
- [Federal Register document](https://www.federalregister.gov/documents/2012/07/23/2012-17644/approval-and-promulgation-of-implementation-plans-tennessee-110a1-and-2-infrastructure-requirements)
---
*AI Analytics · CC0 1.0*