# Approval and Promulgation of Air Quality Implementation Plans; Texas; Revisions to Rules and Regulations for Control of Air Pollution; Permitting of Grandfathered Facilities
> **Rule** · Final rule. · Published 2014-01-06 · Effective 2014-02-05 · 79 FR 577
## Document
- **Document number:** 2013-31560
- **Category:** air-emissions
- **Federal Register citation:** 79 FR 577
- **CFR reference:** 40 CFR 52
- **Publication date:** 2014-01-06
- **Effective date:** 2014-02-05
- **State:** TX
- **EPA docket:** EPA-R06-OAR-2011-0202
## Abstract

The Environmental Protection Agency (EPA) is approving revisions of the Texas State Implementation Plan (SIP) submitted by the State of Texas on July 31, 2002; September 4, 2002; and March 1, 2004. These revisions require that all grandfathered facilities obtain specific permits which include emission control methods to achieve mandated emission reductions, as required, or shutdown; and require that emissions from dockside vessels which result from operations at grandfathered land-based facilities be included in specific permits. The revisions also outline additional permitting procedures for certain grandfathered pipeline equipment located in an ozone nonattainment area. EPA is approving the revisions under the Clean Air Act (CAA or Act), and EPA's regulations.

## Source
- [Federal Register document](https://www.federalregister.gov/documents/2014/01/06/2013-31560/approval-and-promulgation-of-air-quality-implementation-plans-texas-revisions-to-rules-and)
---
*AI Analytics · CC0 1.0*