# Approval and Promulgation of Implementation Plans; Region 4 States; 2008 Lead, 2008 Ozone and 2010 Nitrogen Dioxide Prevention of Significant Deterioration Infrastructure Plans
> **Rule** · Final rule. · Published 2015-03-18 · Effective 2015-04-17 · 80 FR 14019
## Document
- **Document number:** 2015-06112
- **Category:** air-emissions
- **Federal Register citation:** 80 FR 14019
- **CFR reference:** 40 CFR 52
- **Publication date:** 2015-03-18
- **Effective date:** 2015-04-17
- **EPA docket:** EPA-R04-OAR-2014-0610
## Abstract

The Environmental Protection Agency (EPA) is approving portions of submissions from Alabama, Florida, Georgia, Kentucky, Mississippi, South Carolina and Tennessee for inclusion into each State's implementation plan. This action pertains to the Clean Air Act (CAA or Act) infrastructure requirements for the 2008 Lead, 2008 Ozone and 2010 Nitrogen Dioxide (NO<INF>2</INF>) National Ambient Air Quality Standards (NAAQS). The CAA requires that each state adopt and submit a state implementation plan (SIP) for the implementation, maintenance, and enforcement of each NAAQS promulgated by EPA. These plans are commonly referred to as "infrastructure" SIPs. Specifically, EPA is approving the portions of the submissions from Alabama, Florida, Georgia, Kentucky, Mississippi, South Carolina and Tennessee that relate to the infrastructure SIP prevention of significant deterioration (PSD) requirements. All other applicable infrastructure requirements for the 2008 Lead, 2008 Ozone and 2010 NO<INF>2</INF> NAAQS associated with these States are being addressed in separate rulemakings.

## Source
- [Federal Register document](https://www.federalregister.gov/documents/2015/03/18/2015-06112/approval-and-promulgation-of-implementation-plans-region-4-states-2008-lead-2008-ozone-and-2010)
---
*AI Analytics · CC0 1.0*