# Approval and Promulgation of Implementation Plans; Texas; Public Participation for Air Quality Permit Applications
> **Rule** · Direct final rule. · Published 2015-03-30 · Effective 2015-05-29 · 80 FR 16573
## Document
- **Document number:** 2015-07124
- **Category:** air-emissions
- **Federal Register citation:** 80 FR 16573
- **CFR reference:** 40 CFR 52
- **Publication date:** 2015-03-30
- **Effective date:** 2015-05-29
- **State:** TX
- **EPA docket:** EPA-R06-OAR-2015-0033
## Abstract

The Environmental Protection Agency (EPA) is taking a direct final action to approve two provisions submitted by the State of Texas as revisions to the Texas State Implementation Plan (SIP) on July 2, 2010, specific to the applicability of the public notice requirements to applications for Plant-Wide Applicability (PAL) permits and standard permits for concrete batch plants without enhanced controls. Today's direct final action will complete the rulemaking process started in our December 13, 2012, proposal and approve the public notice provisions into the Texas SIP. The EPA is also taking direct final action to convert the public notice applicability provisions for Texas Flexible Permits from a final conditional approval to a full approval. The EPA is taking this action under section 110 and parts C and D of the Clean Air Act (CAA or the Act).

## Source
- [Federal Register document](https://www.federalregister.gov/documents/2015/03/30/2015-07124/approval-and-promulgation-of-implementation-plans-texas-public-participation-for-air-quality-permit)
---
*AI Analytics · CC0 1.0*