# Approval and Promulgation of Air Quality Implementation Plans; State of Missouri, Construction Permits Required
> **Rule** · Final rule. · Published 2015-06-04 · Effective 2015-07-06 · 80 FR 31844
## Document
- **Document number:** 2015-13410
- **Category:** air-emissions
- **Federal Register citation:** 80 FR 31844
- **CFR reference:** 40 CFR 52
- **Publication date:** 2015-06-04
- **Effective date:** 2015-07-06
- **State:** MO
- **EPA docket:** EPA-R07-OAR-2015-0123
## Abstract

The Environmental Protection Agency (EPA) is taking final action to approve revisions to the State Implementation Plan (SIP) for the State of Missouri submitted on October 2, 2013. This final action will amend the SIP to update the construction permits rule to incorporate by reference recent EPA actions related to plantwide applicability limitations (PALs) for greenhouse gases (GHGs) and to correct the definition of "regulated NSR pollutant." Other revisions include modifying the notification period for initial equipment start- up and clarifying de minimis permit air quality analysis requirements.

## Source
- [Federal Register document](https://www.federalregister.gov/documents/2015/06/04/2015-13410/approval-and-promulgation-of-air-quality-implementation-plans-state-of-missouri-construction-permits)
---
*AI Analytics · CC0 1.0*