# Approval and Promulgation of Implementation Plans; Georgia Infrastructure Requirements for the 2008 Lead NAAQS
> **Rule** · Final rule. · Published 2015-10-05 · Effective 2015-11-04 · 80 FR 60045
## Document
- **Document number:** 2015-24860
- **Category:** air-emissions
- **Federal Register citation:** 80 FR 60045
- **CFR reference:** 40 CFR 52
- **Publication date:** 2015-10-05
- **Effective date:** 2015-11-04
- **State:** GA
- **EPA docket:** EPA-R04-OAR-2014-0442
## Abstract

The Environmental Protection Agency (EPA) is taking final action to approve portions of the March 6, 2012, State Implementation Plan (SIP) submission, provided by the State of Georgia, through the Georgia Department of Natural Resources' Environmental Protection Division (EPD) for inclusion into the Georgia SIP. This final submission pertains to the Clean Air Act (CAA or the Act) infrastructure requirements for the 2008 Lead national ambient air quality standards (NAAQS). The CAA requires that each state adopt and submit a SIP for the implementation, maintenance, and enforcement of each NAAQS promulgated by EPA, which is commonly referred to as an "infrastructure" SIP. EPD certified that the Georgia SIP contains provisions that ensure the 2008 Lead NAAQS is implemented, enforced, and maintained in Georgia. With the exception of provisions pertaining to prevention of significant deterioration (PSD) permitting which EPA has already approved, EPA is taking final action to approve Georgia's infrastructure submission, provided to EPA on March 6, 2012, as satisfying the required infrastructure elements for the 2008 Lead NAAQS.

## Source
- [Federal Register document](https://www.federalregister.gov/documents/2015/10/05/2015-24860/approval-and-promulgation-of-implementation-plans-georgia-infrastructure-requirements-for-the-2008)
---
*AI Analytics · CC0 1.0*