# Air Plan Approval; Wisconsin; NOX as a Precursor to Ozone, PM2.5 Increment Rules and PSD Infrastructure SIP Requirements
> **Rule** · Final rule. · Published 2017-02-07 · Effective 2017-03-09 · 82 FR 9515
## Document
- **Document number:** 2017-02530
- **Category:** air-emissions
- **Federal Register citation:** 82 FR 9515
- **CFR reference:** 40 CFR 52
- **Publication date:** 2017-02-07
- **Effective date:** 2017-03-09
- **State:** WI
- **EPA docket:** EPA-R05-OAR-2016-0134
## Abstract

The Environmental Protection Agency (EPA) is approving a revision to Wisconsin's state implementation plan (SIP), revising portions of the State's Prevention of Significant Deterioration (PSD) and ambient air quality programs to address deficiencies identified in EPA's previous narrow infrastructure SIP disapprovals and Finding of Failure to Submit (FFS). This SIP revision request is consistent with the Federal PSD rules and addresses the required elements of the fine particulate matter (PM<INF>2.5</INF>) PSD Increments, Significant Impact Levels (SILs) and Significant Monitoring Concentration (SMC) Rule. EPA is also approving elements of SIP submissions from Wisconsin regarding PSD infrastructure requirements of section 110 of the Clean Air Act (CAA) for the 1997 PM<INF>2.5</INF>, 1997 ozone, 2006 PM<INF>2.5</INF>, 2008 lead, 2008 ozone, 2010 nitrogen dioxide (NO<INF>2</INF>), 2010 sulfur dioxide (SO<INF>2</INF>), and 2012 PM<INF>2.5</INF> National Ambient Air Quality Standards (NAAQS). The infrastructure requirements are designed to ensure that the structural components of each state's air quality management program are adequate to meet the state's responsibilities under the CAA.

## Source
- [Federal Register document](https://www.federalregister.gov/documents/2017/02/07/2017-02530/air-plan-approval-wisconsin-nox-as-a-precursor-to-ozone-pm25-increment-rules-and-psd-infrastructure)
---
*AI Analytics · CC0 1.0*