# Air Plan Approval; Georgia; Revision to I/M Program
> **Rule** · Final rule. · Published 2020-08-24 · Effective 2020-09-23 · 85 FR 52047
## Document
- **Document number:** 2020-16668
- **Category:** air-emissions
- **Federal Register citation:** 85 FR 52047
- **CFR reference:** 40 CFR 52
- **Publication date:** 2020-08-24
- **Effective date:** 2020-09-23
- **State:** GA
- **EPA docket:** EPA-R04-OAR-2019-0195
## Abstract

The Environmental Protection Agency (EPA) is approving a State Implementation Plan (SIP) revision submitted by the State of Georgia through a letter dated March 15, 2019, through the Georgia Department of Natural Resources (GA DNR), Environmental Protection Division (GA EPD). The changes remove obsolete references, clarify the State's inspection and maintenance (I/M) requirements, and update terminology, including to reflect advances in technology. EPA evaluated the SIP revision and determined the changes will not impact emissions under the Georgia I/M program. EPA has determined that approval of the SIP revision will not interfere with attainment or maintenance of any national ambient air quality standard (NAAQS) or with any other applicable requirement of the Clean Air Act (CAA or Act). Therefore, EPA is approving the Georgia's March 15, 2019, SIP revision because it is consistent with the applicable provisions of the CAA.

## Source
- [Federal Register document](https://www.federalregister.gov/documents/2020/08/24/2020-16668/air-plan-approval-georgia-revision-to-im-program)
---
*AI Analytics · CC0 1.0*