# Air Plan Approval; OR; Air Contaminant Discharge Permit Fee Revision
> **Rule** · Final rule. · Published 2022-05-12 · Effective 2022-06-13 · 87 FR 29046
## Document
- **Document number:** 2022-09977
- **Category:** other
- **Federal Register citation:** 87 FR 29046
- **CFR reference:** 40 CFR 52
- **Publication date:** 2022-05-12
- **Effective date:** 2022-06-13
- **EPA docket:** EPA-R10-OAR-2020-0684
## Abstract

The Environmental Protection Agency (EPA) is approving a revision to the Oregon State Implementation Plan (SIP) submitted on November 5, 2020. The revision establishes new fees to be paid by stationary sources of air contaminants that submit notices of intent to construct. The revision also adds a new basic air contaminant discharge permit category to allow certain minor sources, that would otherwise be required to obtain a general, simple, or standard permit, the option to qualify for a basic permit.

## Source
- [Federal Register document](https://www.federalregister.gov/documents/2022/05/12/2022-09977/air-plan-approval-or-air-contaminant-discharge-permit-fee-revision)
---
*AI Analytics · CC0 1.0*