# Air Plan Approval; Michigan; DTE River Rouge
> **Rule** · Direct final rule. · Published 2023-07-24 · Effective 2023-09-22 · 88 FR 47377
## Document
- **Document number:** 2023-15404
- **Category:** air-emissions
- **Federal Register citation:** 88 FR 47377
- **CFR reference:** 40 CFR 52
- **Publication date:** 2023-07-24
- **Effective date:** 2023-09-22
- **State:** MI
- **EPA docket:** EPA-R05-OAR-2023-0031
## Abstract

The Environmental Protection Agency (EPA) is approving a request submitted by the Michigan Department of Environment, Great Lakes, and Energy (EGLE) on January 12, 2023, and supplemented on April 19, 2023, to revise the Michigan state implementation plan (SIP) for particulate matter (PM). The revision updates the fugitive dust plan for the Detroit Edison--River Rouge Power Plant (DTE Energy) located in River Rouge, Michigan. The facility is no longer in operation and therefore, the plan eliminates requirements to reflect plant shut down.

## Source
- [Federal Register document](https://www.federalregister.gov/documents/2023/07/24/2023-15404/air-plan-approval-michigan-dte-river-rouge)
---