# Air Plan Approval; Iowa; State Implementation Plan and State Operating Permits Program
> **Rule** · Final rule. · Published 2024-04-19 · Effective 2024-05-20 · 89 FR 28640
## Document
- **Document number:** 2024-08281
- **Category:** air-emissions
- **Federal Register citation:** 89 FR 28640
- **CFR reference:** 40 CFR 52
- **Publication date:** 2024-04-19
- **Effective date:** 2024-05-20
- **State:** IA
- **EPA docket:** EPA-R07-OAR-2024-0064
## Abstract

The Environmental Protection Agency (EPA) is taking final action to approve revisions to the Iowa State Implementation Plan (SIP) and the Operating Permit Program for the State of Iowa. The revisions update incorporations by reference to EPA methods for performance testing (stack testing), update the definitions, and adopt the most recent National Ambient Air Quality Standards (NAAQS) for ozone. These revisions do not impact the stringency of the SIP or have an adverse effect on air quality. The EPA's approval of this rule revision is being done in accordance with the requirements of the Clean Air Act (CAA).

## Source
- [Federal Register document](https://www.federalregister.gov/documents/2024/04/19/2024-08281/air-plan-approval-iowa-state-implementation-plan-and-state-operating-permits-program)
---
*AI Analytics · CC0 1.0*