# Air Plan Approval; Wisconsin; Infrastructure SIP Requirements for the 2015 Ozone NAAQS
> **Rule** · Final rule. · Published 2024-08-30 · Effective 2024-09-30 · 89 FR 70500
## Document
- **Document number:** 2024-19548
- **Category:** air-emissions
- **Federal Register citation:** 89 FR 70500
- **CFR reference:** 40 CFR 52
- **Publication date:** 2024-08-30
- **Effective date:** 2024-09-30
- **State:** WI
- **EPA docket:** EPA-R05-OAR-2018-0664
## Abstract

The Environmental Protection Agency (EPA) is approving elements of a State Implementation Plan (SIP) submission from Wisconsin regarding the infrastructure requirements of section 110 of the Clean Air Act (CAA) for the 2015 ozone National Ambient Air Quality Standards (NAAQS). The infrastructure requirements are designed to ensure that the structural components of each state's air quality management program are adequate to meet the state's responsibilities under the CAA.

## Source
- [Federal Register document](https://www.federalregister.gov/documents/2024/08/30/2024-19548/air-plan-approval-wisconsin-infrastructure-sip-requirements-for-the-2015-ozone-naaqs)
---
*AI Analytics · CC0 1.0*