# Approval and Promulgation of Implementation Plans; California State Implementation Plan Revision, Santa Barbara County Nonattainment Area, Transportation Control Measure Replacement
> **Rule** · Direct final rule. · Published 1995-05-01 · Effective 1995-06-30 · 60 FR 21045
## Document
- **Document number:** 95-10613
- **Category:** air-emissions
- **Federal Register citation:** 60 FR 21045
- **CFR reference:** 40 CFR 52
- **Publication date:** 1995-05-01
- **Effective date:** 1995-06-30
- **State:** CA
- **EPA docket:** CA 122-1-6982a
## Abstract

The Environmental Protection Agency (EPA) is taking direct final action to approve a revision to the California State Implementation Plan (SIP) for ozone for Santa Barbara County, which was submitted to EPA on November 14, 1994. This direct final approval action deletes a transportation control measure (TCM) from the federally-approved 1982 California ozone SIP and replaces it with a TCM from the state-adopted 1994 California ozone SIP. The intended effect of direct final approval of this SIP revision is to control emissions of ozone precursors in accordance with the requirements of the Clean Air Act, as amended in 1990 (CAA or 1990 Act).

## Source
- [Federal Register document](https://www.federalregister.gov/documents/1995/05/01/95-10613/approval-and-promulgation-of-implementation-plans-california-state-implementation-plan-revision)
---
*AI Analytics · CC0 1.0*