# Approval and Promulgation of Implementation Plans for Ozone; Illinois
> **Rule** · Direct final rule. · Published 1995-01-27 · Effective 1995-03-28 · 60 FR 5318
## Document
- **Document number:** 95-2015
- **Category:** air-emissions
- **Federal Register citation:** 60 FR 5318
- **CFR reference:** 40 CFR 52
- **Publication date:** 1995-01-27
- **Effective date:** 1995-03-28
- **State:** IL
- **EPA docket:** IL105-1-6841a
## Abstract

The U.S. Environmental Protection Agency (USEPA) approves the State Implementation Plan (SIP) revision request submitted by the State of Illinois on October 25, 1994, for the purpose of requiring the installation of pressure/vacuum (P/V) relief valves on storage tank vent pipes at certain gasoline dispensing operations in the Chicago and Metro-East St. Louis (Metro-East) ozone nonattainment areas. The rationale for the approval is set forth in this final rule; additional information is available at the address indicated. In the proposed rules section of this Federal Register, USEPA is proposing approval of and soliciting public comment on this requested SIP revision. If adverse comments are received on this direct final rule, USEPA will withdraw this direct final rule and address the comments received in a subsequent final rule on the related proposed rule which is being published in the proposed rules section of this Federal Register. No additional opportunity for public comment will be provided. Unless this direct final rule is withdrawn no further rulemaking will occur on this requested SIP revision.

## Source
- [Federal Register document](https://www.federalregister.gov/documents/1995/01/27/95-2015/approval-and-promulgation-of-implementation-plans-for-ozone-illinois)
---
*AI Analytics · CC0 1.0*