# Approval and Promulgation of Implementation Plans: Washington
> **Rule** · Direct final rule. · Published 1995-10-25 · Effective 1995-12-26 · 60 FR 54599
## Document
- **Document number:** 95-26466
- **Category:** air-emissions
- **Federal Register citation:** 60 FR 54599
- **CFR reference:** 40 CFR 52
- **Publication date:** 1995-10-25
- **Effective date:** 1995-12-26
- **State:** WA
- **EPA docket:** WA5-1-5539a
## Abstract

Environmental Protection Agency (EPA) approves a revision to the State implementation plan (SIP) submitted by the State of Washington for the purpose of bringing about the attainment of the national ambient air quality standards (NAAQS) for particulate matter with an aerodynamic diameter less than or equal to a nominal 10 micrometers (PM-10). The implementation plan was submitted by the State to satisfy certain Federal requirements for an approvable moderate nonattainment area PM-10 SIP for Tacoma, Washington. On October 12, 1994, EPA approved certain separable sections and conditionally approved other sections of the Tacoma PM-10 SIP revision (59 FR 51506 (October 12, 1994)). In this action, EPA finds the State has fulfilled the terms of the conditional approval and that the SIP submitted fully satisfies the requirements of the Federal Clean Air Act.

## Source
- [Federal Register document](https://www.federalregister.gov/documents/1995/10/25/95-26466/approval-and-promulgation-of-implementation-plans-washington)
---
*AI Analytics · CC0 1.0*