# Approval and Promulgation of State Implementation Plan, North Carolina: Approval of Cape Industries, Air Permit No. 130R17
> **Rule** · Direct final rule. · Published 1996-09-20 · Effective 1996-11-19 · 61 FR 49413
## Document
- **Document number:** 96-24045
- **Category:** other
- **Federal Register citation:** 61 FR 49413
- **CFR reference:** 40 CFR 52
- **Publication date:** 1996-09-20
- **Effective date:** 1996-11-19
- **State:** NC
- **EPA docket:** NC-43-1-9618a
## Abstract

On August 17, 1989, the State of North Carolina issued to Cape Industries, located in Wilmington, New Hanover County, North Carolina, air permit number 130R11, which set the sulfur dioxide emission limit at 2.3 pounds per million British Thermal Units (BTU). The State then submitted this permit to EPA on September 21, 1989, for approval as a revision to the State implementation plan (SIP). Air permit number 130R11 expired on October 1, 1991, and was subsequently replaced by the current Cape Industries air permit number 130R17 on December 29, 1994. Upon review of the permit, EPA finds that the designated limit for Cape Industries is adequate to protect the ambient standard and approves this permit.

## Source
- [Federal Register document](https://www.federalregister.gov/documents/1996/09/20/96-24045/approval-and-promulgation-of-state-implementation-plan-north-carolina-approval-of-cape-industries)
---
*AI Analytics · CC0 1.0*