# Approval and Promulgation of State Implementation Plan; Wisconsin; Site-Specific SIP Revision for Amron Corporation
> **Rule** · Final rule. · Published 1998-07-23 · Effective 1998-08-24 · 63 FR 39515
## Document
- **Document number:** 98-19656
- **Category:** other
- **Federal Register citation:** 63 FR 39515
- **CFR reference:** 40 CFR 52
- **Publication date:** 1998-07-23
- **Effective date:** 1998-08-24
- **State:** WI
- **EPA docket:** WI76-02-7305
## Abstract

This rulemaking finalizes the Environmental Protection Agency's (EPA's) disapproval of a site-specific State Implementation Plan (SIP) revision for the Amron Corporation facility located at 525 Progress Avenue in Waukesha. The SIP revision was submitted by the Wisconsin Department of Natural Resources (WDNR) on February 21, 1997, and would exempt the facility from the volatile organic compound (VOC) emission limits applicable to miscellaneous metal coating operations. The EPA proposed to disapprove this request on April 28, 1998. No negative comments were submitted during the comment period.

## Source
- [Federal Register document](https://www.federalregister.gov/documents/1998/07/23/98-19656/approval-and-promulgation-of-state-implementation-plan-wisconsin-site-specific-sip-revision-for)
---
*AI Analytics · CC0 1.0*