PURPOSE OF THE PROJECT / TASK 1.1 This project is intended to upgrade the existing fire alarm systems in 30+ Frederick National Laboratory Buildings at Ft. Detrick. 2.0 PROGRAM OF REQUIREMENTS 2.1 General Requirements 2.1.1 Required Site Interfaces. This will be a subcontracted construction project performed throughout Ft. Detrick. 2.1.2 Parking. There is minimal parking in the area for the craft workers. A Parking / Laydown Area will be determined and presented to the Contractor as part of the procurement process.