FY24 FACILITIES TO D - 126629 B322 INSTALL VESTIBULE AND COVERED WALKWAY This project will install two vestibules outside of Lab 110 and Lab 112. In addition, a connecting covered walkway will be installed between the Lab 110 door and the existing vestibule Room 115. To ensure the vestibules can be installed as planned, the project will also relocate two cylinder/dewars from the current location outside of Lab 110 to the new location outside Lab 112. This relocation will include respective piping and connections inside B322.