# Oil and Gas and Sulphur Operations in the Outer Continental Shelf (OCS)-Minimum Blowout Prevention (BOP) System Requirements for Well-Workover Operations Performed Using Coiled Tubing With the Production Tree in Place
> **Bureau of Land Management** · Final rule. · Published 2006-03-07 · Effective 2006-04-06 · 71 FR 11310
## Document
- **Document number:** 06-2101
- **Category:** oil-gas-leasing
- **Sub-agency:** Bureau of Land Management
- **Federal Register citation:** 71 FR 11310
- **CFR reference:** 30 CFR 250
- **Publication date:** 2006-03-07
- **Effective date:** 2006-04-06
## Abstract

This rule upgrades minimum blowout prevention and well control requirements for well-workover operations on the OCS performed using coiled tubing with the production tree in place. Since 1997, there have been eight coiled tubing-related incidents on OCS facilities. The rule helps prevent losses of well control, and provides for increased safety and environmental protection.

## Source
- [Federal Register document](https://www.federalregister.gov/documents/2006/03/07/06-2101/oil-and-gas-and-sulphur-operations-in-the-outer-continental-shelf-ocs-minimum-blowout-prevention-bop)
---
*AI Analytics · CC0 1.0*