# Acquisition Regulation Rewrite
> **US Department of the Interior** · Interim final rule. · Published 2010-04-15 · Effective 2010-05-17 · 75 FR 19828
## Document
- **Document number:** 2010-7967
- **Category:** other
- **Sub-agency:** US Department of the Interior
- **Federal Register citation:** 75 FR 19828
- **Publication date:** 2010-04-15
- **Effective date:** 2010-05-17
## Abstract

The Department of the Interior (DOI) is taking interim final action on administrative changes to the Department of the Interior Acquisition Regulation (DIAR). This action revises the DIAR, 48 CFR Chapter 14, but does not impose any new requirements on DOI contractors. The revisions in this interim final rule will make minor corrections to and streamline DOI acquisition processes to be consistent with and non-duplicative of the Federal Acquisition Regulation (FAR). Some DIAR coverage is being revised and obsolete material is being removed. FAR clauses are now available that provide coverage for the DIAR clauses that are removed by this rule.

## Source
- [Federal Register document](https://www.federalregister.gov/documents/2010/04/15/2010-7967/acquisition-regulation-rewrite)
---
*AI Analytics · CC0 1.0*