# Oil and Gas and Sulfur Operations in the Outer Continental Shelf-Blowout Preventer Systems and Well Control
> **Bureau of Land Management** · Final rule. · Published 2016-04-29 · Effective 2016-07-28 · 81 FR 25888
## Document
- **Document number:** 2016-08921
- **Category:** oil-gas-leasing
- **Sub-agency:** Bureau of Land Management
- **Federal Register citation:** 81 FR 25888
- **CFR reference:** 30 CFR 250
- **Publication date:** 2016-04-29
- **Effective date:** 2016-07-28
- **Interior docket:** Docket ID: BSEE-2015-0002
## Abstract

Bureau of Safety and Environmental Enforcement (BSEE) is finalizing new regulations to consolidate into one part the equipment and operational requirements that are found in various subparts of BSEE's regulations pertaining to offshore oil and gas drilling, completions, workovers, and decommissioning. This final rule focuses on blowout preventer (BOP) and well-control requirements, including incorporation of industry standards and revision of existing regulations, and adopts reforms in the areas of well design, well control, casing, cementing, real-time well monitoring, and subsea containment. The final rule also addresses and implements multiple recommendations resulting from various investigations of the Deepwater Horizon incident. This final rule will also incorporate guidance from several Notices to Lessees and Operators (NTLs) and revise provisions related to drilling, workover, completion, and decommissioning operations to enhance safety and environmental protection.

## Source
- [Federal Register document](https://www.federalregister.gov/documents/2016/04/29/2016-08921/oil-and-gas-and-sulfur-operations-in-the-outer-continental-shelf-blowout-preventer-systems-and-well)
---
*AI Analytics · CC0 1.0*