# Resource Agency Hearings and Alternatives Development Procedures in Hydropower Licenses
> **US Department of the Interior** · Final rules; response to comments. · Published 2016-11-23 · Effective 2016-11-23 · 81 FR 84389
## Document
- **Document number:** 2016-28063
- **Category:** other
- **Sub-agency:** US Department of the Interior
- **Federal Register citation:** 81 FR 84389
- **CFR reference:** 7 CFR 1
- **Publication date:** 2016-11-23
- **Effective date:** 2016-11-23
- **Interior docket:** Docket No. 080220223-6961-03
## Abstract

The Departments of Agriculture, the Interior, and Commerce are jointly issuing final rules for procedures for expedited trial-type hearings and the consideration of alternative conditions and fishway prescriptions required by the Energy Policy Act of 2005. The hearings are conducted to expeditiously resolve disputed issues of material fact with respect to conditions or prescriptions developed for inclusion in a hydropower license issued by the Federal Energy Regulatory Commission under the Federal Power Act. The final rules make no changes to existing regulations that have been in place since the revised interim rules were published on March 31, 2015, and took effect on April 30, 2015. At the time of publication of the revised interim rules, the Departments also requested public comments on additional ways the rules could be improved. The Departments now respond to the public comments received on the revised interim rules by providing analysis and clarifications in the preamble. The Departments have determined that no revisions to existing regulations are warranted at this time.