# Indian Electric Power Utilities
> **US Department of the Interior** · Final rule. · Published 2018-11-28 · Effective 2018-12-28 · 83 FR 61116
## Document
- **Document number:** 2018-25943
- **Category:** other
- **Sub-agency:** US Department of the Interior
- **Federal Register citation:** 83 FR 61116
- **CFR reference:** 25 CFR 175
- **Publication date:** 2018-11-28
- **Effective date:** 2018-12-28
- **Interior docket:** 190A2100DD/AAKC001030/A0A501010.999900 253G
## Abstract

This rule revises regulations addressing electric power utilities of the Colorado River, Flathead, and San Carlos Indian irrigation projects to use plain language, update definitions, lengthen a regulatory deadline, and make other minor changes.

## Source
- [Federal Register document](https://www.federalregister.gov/documents/2018/11/28/2018-25943/indian-electric-power-utilities)
---
*AI Analytics · CC0 1.0*