Revisions to Subpart A-General; Subpart I-Platforms and Structures; and Subpart J-Pipelines and Pipeline Rights-of-Way
oil-gas-leasing · Bureau of Land Management · Published 2008-10-30 · Effective 2008-12-01 · 73 FR 64541
Document
Document number
E8-25720
Federal Register citation
73 FR 64541
CFR reference
30 CFR 250
Type
Rule
Action
Final rule.
Category
oil-gas-leasing
Sub-agency
Bureau of Land Management
Publication date
2008-10-30
Effective date
2008-12-01
Interior docket
Docket ID MMS-2008-OMM-0001
Abstract
The MMS is amending its regulations to require lessees, lease operators, and pipeline right-of-way holders to submit a report if a facility or pipeline is damaged by a hurricane or other natural phenomena. The final rule also requires operators to provide assessment information on the structural integrity of Outer Continental Shelf platforms; information on the use of unbonded flexible pipe for pipelines; and additional information when installing pipeline risers on floating platforms. The rule also incorporates an industry-developed standard concerning the in-service inspection of mooring hardware for floating drilling units. These changes will allow MMS to better regulate the safety of the oil and gas infrastructure, and to promptly assess damage resulting from hurricanes or other natural phenomena.