EE WORKING AT LENOIR. THE PLANT CONSTRUCTION TRAILER HAD JUST BEEN MOVED IN, GETTING READY FOR THE PLANT REBUILD. EE AND OTHER WERE IN THE TRAILER ATTEMPTING TO REALIGN THE TUBES THAT ARE USED TO HOLD THE BLUE PRINTS DURING THE PROJECT. THETUBES ARE ACTUALLY PVC PIPE THAT HAS BEEN CUT TO THE DESIRED LENGTH. THE TUBES HAD SHIFTED AND EE WAS USING A BIT OF FORCE TRYING TO LINE THEM B