ON JUNE 16, 2000 AT 3:08 P.M. A TREE FELL ONT HE POWER LINE CAUSING A TRANSFORMER TO BLOW AT THE MINE. THIS TOOK OUT THE POWER TO THE CHIPPY HOIST, HOWEVER WE COULD STILL RUN THE DOUBLE-DRUM H OIST BY ISOLATING THE POWER. THE POWER WAS FULLY RESTORED AT 4:28 P.M. AND CREWS WENT TO WORK. AT 6:00 P.M. THE POWER WENT OFF AGAIN AND WAS RESTORED AT 8:50 P.M. ALL CREWS SAT ON STATIONS DU