AN MSHA INSPECTION ADVISED THE HOISTING SPEED CANNOT BE CONTROLLED AT ALL TIMES WHEN COMING TO A STOP IN EITHER DIRECTION. THE HYD PUMP CONTROL CIRCUITS SOLENOIDS WERE NEUTRALIZED ON ALL FOUR PUMPS. ALSO AN ORIFICE WAS REMOVED FROM PUMP 4. THE HOIST WAS RETURNED TO SERVICE AT 1:50PM